SeaMade Wind Farm

SeaMade stands for a combination of two offshore wind projects, formerly known as Mermaid (235 MW) and Seastar (252 MW). The SeaMade projects are located 40-50 km off the coast of Ostend (Belgium).

Eneco Wind Belgium has a 12.5% stake in the project. Other shareholders are ENGIE Electrabel (17.5%) and Otary RS NV, in which several parties are united (70%).
slider-windpark-seamade

Construction

SeaMade has been fully operational since the end of 2020. The amount of renewable power that the wind farm generates equals the average annual electricity consumption of approximately 485,000 households. Eneco purchases all the power generated by SeaMade, supplying it to its Belgian customers.


seamade-plaatsen-windmolens
Watch the time-lapse video of how the Seamade windmills are installed at sea.

Facts & Figures

Wind turbines
  • 58 turbines
  • Type: SGRE (Siemens Gamesa Renewable Energy)
  • Rotor diameter: 167 meters
Installed capacity
  • 487 MW
CO₂ reduction
  • > 500.000 tons per year
Customer care employee

Contact

Do you have any questions about SeaMade Wind Farm after reading this information? Then click the button below to mail them to us.

Related pages

Take a look what else we have achieved to achieve our mission of "sustainable energy for everyone".
Wind farm Norther offshore

Norther Wind Farm

CrossWind 688

Hollandse Kust (Noord) Wind Farm

windpark luchterduinen

Borssele III/IV Wind Farm